Establishing operations in B.C.
Existing industrial properties, or brownfields, are pre-screened by our experts to ensure there is sufficient land, electrical infrastructure, and transmission or distribution capacity available to a new customer.
New properties, or greenfields, have minimal or no infrastructure to connect to the grid. Connecting a new site has added costs and longer timelines but may offer operational flexibility.
Industrial site support
BC Hydro will support owners of under-utilized industrial sites to assess and improve a property's electrical infrastructure, if required, to ready it for an identified new customer. Funding may be available.
Process to connect
The process, costs, and timelines to connect to our electrical grid vary depending on load requirement and location. Connecting to an existing site depends on the electrical capacity required by the operation. Funding is available to eligible applicants to offset connection costs:
- Major distribution connection (12 kilovolts (kV) to 35 kV)
- Transmission connection (greater than 35 kV)